New plumbing happens in stages: underground, rough-in in the framing, and finish fixtures at the end. Each stage has an inspection, and each depends on the one before it. Getting the sequence right keeps a build on schedule.

Call and describe the project and the stage it is in.

The stages of new plumbing

  • UndergroundSewer and water lines placed before the slab or basement floor.
  • Rough-inPipes in walls and floors before drywall.
  • FinishFixtures, faucets and appliances connected at the end.

Plan before you frame

Plumbing needs space. A plan that puts a wet wall over a beam, or a shower where the drain cannot reach the main, causes costly changes. Walk the drawings with the plumber before framing starts.

Fixture counts, locations, water heater type and gas needs all go into the plan. Ask about the main line size and whether the water meter and tap are included in the plan or handled by the builder.

Underground and the slab

Drain lines and water service are laid first, then inspected before concrete is poured. Errors at this stage cost a lot to correct. Slopes, cleanout locations and pipe sleeves through foundation walls must be right.

In clay soil, pipe bedding and protection matter. Expansive soil, which the Colorado Geological Survey calls the state's most significant geologic hazard, can move a foundation and the pipes through it.

Cost

What drives new construction plumbing cost

New plumbing is bid per project. These items drive the bid.

  • 1House size and fixture count. More bathrooms and kitchens means more pipe.
  • 2Foundation type. Basements and slabs differ.
  • 3Water heater and gas. Tankless or multiple units change scope.
  • 4Fixture quality. Finish fixtures vary widely.
  • 5Schedule. Rushed schedules can raise labor costs.

Get a written bid listing what is included, including fixtures and permits.

In Louisville

Building in Louisville and the surrounding towns

Louisville and its neighbors, including Superior, Lafayette and Erie, have seen both infill and new subdivisions. Each town has its own permit process, so confirm which building department applies.

Rebuilding after the Marshall Fire involved many homes in Louisville and Superior, which meant a large number of new plumbing installations. Ask whether your contractor has worked in your town's permit system.

Rough-in and inspection

Once the framing is up, supply and drain pipes are run through walls and floors, vents go through the roof and gas lines are placed. A pressure test shows the supply and gas lines are tight, and a water test checks the drains.

The building department inspects rough-in before drywall. Passing is required to proceed. Keep the inspection approval on site.

Finish plumbing

After drywall, paint and flooring, fixtures go in: toilets, sinks, faucets, tubs, showers, water heater and appliances. The system is flushed and tested, and the final inspection follows.

Fixture selection matters. Order items early because lead times vary, and confirm that the rough-in dimensions match the models chosen.

Questions to settle before the first pipe goes in

Decide early whether the water heater will be a tank, a tankless unit or a heat pump model. The choice changes gas line size, venting, floor space and electrical needs. Changing it after rough-in costs time.

Ask who is responsible for each part of the job: the water service from the main, the sewer tap, trench restoration, permits and inspection scheduling. These often sit between the builder, the plumber and the utility, and gaps cause delays.

Agree on cleanout locations and shutoff valve locations on paper. A cleanout buried under a patio or a main shutoff hidden behind a cabinet is a future headache. Mark them on the plan and photograph them before walls close.

Services for a new house

Quick answers

What people ask about new construction

As early as possible, before framing. The plumber can flag layout issues while they are easy to change.

Typically underground, rough-in and final. Your building department lists them.

It depends on the contract. Clarify whether the plumber or the builder provides them.

Yes, but the drain depth matters. A basement bathroom may need an ejector pump.

Call the line and name the address and the builder. A pressure-test failure or a frozen line on a framed house is a real emergency.

Call and give the address and the builder. A failed pressure test or a frozen line in a framed house is a genuine emergency, and the contractor will tell you what to close.

Most plumbing contractors pull their own permits and schedule inspections for their work. Confirm that before signing so nothing is left to the builder by assumption.

Planning a build or addition?

Describe the project when you call. The dispatcher puts you through to a contractor experienced in new work.

Call (720) 915-0565

Service area centered on Louisville and nearby Boulder County cities.

Call (720) 915-0565 · 24/7 Emergency Plumber